Posted 5 years ago
Pump chamber install #2
New Drainlaying
Paraparaumu, Kapiti Coast
Job to install pump chamber, piping, vent, gully trap, pump, check valve, shut off valve, fluid level float, and carry pipe to lateral at boundary.
Most materials onsite. Sand and pea metals onsite. Hole and trench dug out already. Need hole saw to cut tank for uniseal.
Might need small digger or wheel barrow to get sand and pea metals into the trench/hole. And clean the hole before bedding.