We have a new build going in and require a pre-plumb and then final fit out.
I can send plans once emails are exchanged. Would be looking for a start on October 30 for preplumb
Trade professionals
#1
Tradie 1
39 jobs
No longer in contact
#2
Tradie 2
69 jobs
No longer in contact
#3
Tradie 3
58 jobs
No longer in contact
#4
Tradie 4
124 jobs
No longer in contact
#5
Tradie 5
unrated
1 job
No longer in contact
Get connected now
with NZ’s largest trade professional network