Trusted Project Managers.
NZ wide.
Sorted.

Learn more about the trades we cover.

Recent jobs posted

Check out how homeowners like you are using Project Managers on Builderscrack to build, repair and improve their homes right now.

Civil Works - New concrete right of way, wastewater and stormwater connection

Posted 8 hours ago

New Concrete Right of Way : - Remove and dispose of the existing driveway - Remove and dispose of existing carports and concrete under the carports. - Set out of the proposed driveway - driveway to be 3.0m wide however the strip between the two driveways is to be removed and replaced as necessary to achieve the new longitudinal grade. (the existing entrance stairs to remain) - Allow to dig and backfill 600mm deep by 400mm trench for services under the driveway. Conduit for power, telco an...

Read more

Tiny Home Resource & Building Consent

Posted 13 hours ago

Help me apply for a resource & building consent for my tiny home to be placed at 14 Withiel Drive, Epsom, Auckland (front yard section). As well as check for any issues regarding water/power connection issues or landscape adjustments (like chopping down of trees). I want to make sure everything is ready to go, before going ahead and purchasing a Tiny Home.

Read more

Popes Road Project

Posted 1 day ago

We are in the market for a QS and Project Manager to start a relationship in building a project in Takanini.

Read more

COA for a shower

Posted 1 day ago

I have a shower that I would like to get a concent for. Im not too sure of the process so someone who knows. Cheers

Read more

Draft plan of existing bach building

Posted 4 days ago

King removals Invercargill have 1bedroom bach that we need to assess for viability of relocating to Alexandra for location on elevated section subject to provision for high wind zone (SED). Draft plan of structure required for slab and consent approvals required. ...

Read more

2nd dwelling

Posted 5 days ago

Consent got put a 2nd dwelling on a 70 acher property in Ramarama. Zoned as rural production

Read more

New Build - stormwater management report

Posted 1 week ago

I require a stormwater management report and advice on retention tanks for a new build residential consent.

Read more

Retrospective building consent

Posted 1 week ago

I am a prospective buyer after a comprehensive quote for remedial work required for the property to be granted a resource consent.

Read more

Minor Dwelling for Air B&B

Posted 1 week ago

Looking at dropping a small cottage on our lake Okareka property and need to make sure of consent requirements as well as sewerage requirements. Plus anything else we should know about for this to happen.

Read more

Project Manager

Posted 1 week ago

I need a an experienced project manager to look after the expenses side of my house extension project in Dairy Flat.

Read more

Planner

Posted 2 weeks ago

I need someone to help manage all consents for my 65sq minor dwelling residential property including; - Building Consent - Resource Consent - 65sq metre property I need someone that is available to start this process asap, and I am needing someone who is able to communicate with me essential by email. No face to face appointment as I am very busy with a full time job, but the builder can meet if required. If you are interested I will provide information for a quote.

Read more

Plumbing job for an additional bathroom and Building consent application

Posted 2 weeks ago

Hi guys, We are looking for a plumber who would take care of the building consent application and plumbing work for an additional ensuite bathroom in a flat (worker's accommodation) in an industrial building in East Tamaki. Thank you!

Read more

House completion

Posted 3 weeks ago

Needing a builder to quote finishing off a house for consent that I am purchasing, I have the most recent building consent list available. The main work is to complete building 3 bathrooms which were partially finished , extending soffit boards, some tiling and to arrange the inspection for consent

Read more

Update building plans

Posted 3 weeks ago

Hi there, we are making a small change in our place, introducing a kitchenette in one of our rooms. We have already started the process for a building consent but they required an updated of the existing plans. We are looking for someone who would be able to find the building plans and update them according to the requests from the council. Looking forward to hear from you.

Read more

Building Consent for a Garage in Christchurch

Posted 4 weeks ago

Hello, I have bought a flatpack Versatile Garage 6x7.2 and need help with completing the building consent. There is no existing garage on the property. Can anyone help me to either complete the documentation for the council or submit it on my behalf.

Read more

Planner/ Designer for Exemption from Building Consent

Posted 4 weeks ago

I need a designer to help with completing a - B004 Application for Exemption from Building Consent. I am installing a Relocatable Hair Salon. Focusing on foundation design complies with building code and appropriate for ground conditions.

Read more

Earthquake repairs

Posted 4 weeks ago

In the recent earthquake, our house has shifted and new cracks have appeared around most windows, some doors, some skirting boards and house joins. I need a quote for our EQC claim and to get the damage repaired.

Read more

Resolution of past building consent

Posted 1 month ago

I have a report from Council detailing building consent issues from a historical process. The issues are mainly small but need coordinating and resolving through Council.

Read more

Drawing and consent for garage change of use renovation

Posted 1 month ago

Building plans and consent management for change of use from internal garage (ground floor ) to bedroom.

Read more

Building Consent - Finalise Paperwork

Posted 1 month ago

Quite some years ago, I got building consent for work on my house: put in fireplace, renovate/change layout of 2 bathrooms, convert garage into 2 bedrooms... Unfortunately, work took incredibly long. I need for someone with a great working relationship to PNCC to carry sign-off over the finish line for me. I don't know what is needed to make this happen. The work that is not finished and will not happen now (because this is just taking way too long) is changing a window into a door and another d...

Read more

Recent management, planning & consent reviews

With over 166,000 reviews in total, and an average rating of 9/10, you can be confident that your job will be handled with the utmost care.

Consent application for a cabin/ art studio

Work carried out by the owner/operator

9th July 2020

Workmanship
 5
Cost
 5
Schedule
 4
Communication
 5

151B Rocking Horse Road As-Is Where-Is rebuild plan

Work carried out by the owner/operator

9th June 2020

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Advice on consent for moving a stove

Work carried out by the owner/operator

24th February 2020

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Wood burner replacement

Work carried out by the owner/operator

17th December 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

New single garage

Work carried out by the owner/operator

6th November 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 4

baxter building consent for cladding replacement

Work carried out by the owner/operator

7th October 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Site Plan of land and building

Work carried out by the owner/operator

30th September 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Deck planning and resource consent process

Work carried out by the owner/operator

11th September 2019

Workmanship
 5
Cost
 5
Schedule
 4
Communication
 5

Help getting a certificate of acceptance

Work carried out by the owner/operator

4th September 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Royal Heights - Sun Shade diagram - for RC


18th June 2019

Workmanship
 4
Cost
 4
Schedule
 4
Communication
 5

GARAGE RENO - BUILDING CONSENT

Work carried out by the owner/operator

30th May 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

14 Poseidon way

Work carried out by the owner/operator

7th May 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

stormwater engineer

Work carried out by an employee of the company

24th December 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Draughting and COA management

Work carried out by the owner/operator

27th November 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Takapau New Kit Set

Work carried out by the owner/operator

9th October 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Resource Consent

Work carried out by the owner/operator

23rd August 2018

Workmanship
 5
Cost
 4
Schedule
 5
Communication
 4

1 hour consultation of building and consent costs


30th July 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5
Get started now! Post your job for free and find the right tradie. Post your job for free, now!