Trusted Surveyors.
NZ wide.
Sorted.

Learn more about the trades we cover.

Recent jobs posted

Check out how homeowners like you are using Surveyors on Builderscrack to build, repair and improve their homes right now.

Geotech Engineer and Report Required

Posted 3 hours ago

We need someone to carry out an investigation in New Lynn. We are doing DD on a property that already has a recourse consent and building consent. The issue is the report that the consents are based on is very light ie one shallow bore hole. The construction area is 450m2 and is in a floodplain we hope to redesign and provide a better solution. Our Engineer requires a more thorough investigation to allow him to plan for a new proposal. For us Settlement is in 30 days so we need a consultant th...

Read more

Valuation on completed renovation project

Posted 6 hours ago

Quote request to present a valuation of a property and a valuation on completed renovation project. I've met a few contractors and estimated a full refurbish of the property for around 100k. If you can help with some advice please give me a ring ...

Read more

Removing load bearing wall

Posted 7 hours ago

We wouldnlike yo take out the wall between the kitchen and lounge to have open plan. This is a load bearing wall.we have been told. The wall is 5.3 metres long. Thanks :)

Read more

Feasibility of site for building new house

Posted 1 day ago

HI I have an old house in hillsborough on a crosslease title. Would like advice on how to go about building a new house. Advise on what issues to expect as regards to driveway, drainage.

Read more

Geotech report

Posted 1 day ago

Geotech report new house build

Read more

New House

Posted 2 days ago

Looking for a structural engineer for a new house design in Churton Park, Wellington. The scope will mainly include, concrete foundation, beams, bracing and preparation of council documents with PS1 and construction monitoring/PS4. The design is still in the concept stage and looking to finalize and go for the structural design in 6-8 weeks time.

Read more

Boundry peg property

Posted 2 days ago

I have a previous survey on file showing the points requiring physical pegging. 5 total. Available any time

Read more

Driveway #2

Posted 5 days ago

Wanting the following: 1 - Detailed plans, including: - a site plan(s) that shows the existing topography and where proposed cut or will be carried out - elevations and cross sections of the proposed cut or fill details of any proposed retaining structures. 2 - An environmental effects assessment of the earthworks, including: - An assessment of the earthwork's visual effects, and proposed mitigation measures. - How land stability on and next to the site will be maintained. If t...

Read more

Workbench weight certification

Posted 6 days ago

We have workbench at our worksite which requires maximum weight rating. All details of the table mentioned as per attached photo. As per the work safety requirement , we require the maximum safety rating stamping from a certified engineer.

Read more

Working drawings

Posted 1 week ago

EQC has done the initial servy and report for a land slip and repair suggestion are given by them. Additional demage and work along with the EQC suggestion working drawings are required. No obligation site visit will be helpful.

Read more

New subdivision land on Amesbury Drive in Churton Park, work consistent

Posted 1 week ago

Items required: • Survey with 500mm maximum height inteval lines for archtect to acuratly model the site, survey points height helpful to model the site. • Show where fall in the back of the section is • Existing services • Boundary and pegs points

Read more

Earthworks Management Plan review for council

Posted 1 week ago

Review needed to be completed after being let down by our existing Geotech Engineer. We have completed the plan and need it reviewed by a Geotech Engineer before we can start. We have completed plans before and had them signed off but have been waiting 3.5 months and can't wait any longer. This is a staged subdivision so would like to start a relationship with someone that can continue into the future. Photo of first 2 houses that have been completed now. We have the original geotech report...

Read more

New house #3

Posted 1 week ago

Hi I'm after an exposed truss design for a gable end which projects 2 meters from the house.

Read more

Eastern boundary

Posted 1 week ago

Survey of Eastern boundary at Seaview Road Piha. Property run s through to Piha Road Piha

Read more

Umuhapuku Block

Posted 1 week ago

Estimate or quote to survey the internal boundaries of Umuhapuku Blocks i.e. 2A - 2F. We already have one from Donaldsons. We need two more.

Read more

Highbury rd

Posted 1 week ago

Geo report for new garage slab location. Easy access next to driveway.

Read more

Papakainga Project

Posted 1 week ago

Our whanau Trust are proposing to build 11 homes on whanau land, under a papakainga project. We would like to know which area is build able and can be done to accommodate 11 houses. The land has a sloping contour then plateaus out to relatively flatter area which is set back slighlt further from main road. Also we appreciate you providing a idea of what this service would cost? Please Note: We are in the discussion phase with regards to the papakainga scheme. Estimated time frame 10...

Read more

Cracked brickwork

Posted 1 week ago

Hi, I have noticed some hairline cracks in the brickwork which has previously been stitched and also a crack in the foundation wall which had been repaired prior to me purchasing the property. I did remove trees from the property as had an inital crack which closed up once the trees were removed and has not moved since. Keen to get someone out to review and assess what is causing the cracks and whether it is serious. The property is on clay and there is movement in summer and winter months.

Read more

Survey land for purchase of land from neighbour

Posted 1 week ago

We're wanting to purchase a strip of land from a neighbour to widen our drive and need surveying done for this.

Read more

Missing pegs

Posted 2 weeks ago

Hi there, We need to relocate three missing boundary pegs of our property. There is a current survey plan to the existing building dated Nov 2011.

Read more

Recent surveying & engineering reviews

With over 146,000 reviews in total, and an average rating of 9/10, you can be confident that your job will be handled with the utmost care.

Subdivision

Work carried out by the owner & subcontractors

3rd October 2019

Workmanship
 5
Cost
 5
Schedule
 4
Communication
 4

Boundary pegs

Work carried out by an employee of the company

30th September 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Boundary set-out

Work carried out by the owner/operator

29th September 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

GeoTech Report Required for new build

Work carried out by an employee of the company

6th September 2019

Workmanship
 5
Cost
 4
Schedule
 5
Communication
 5

Sub division project.

Work carried out by the owner/operator

3rd September 2019

Workmanship
 4
Cost
 5
Schedule
 5
Communication
 5

Geotech Report 5 Waitete Road


3rd September 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Boundary peg to be located

Work carried out by the owner/operator

13th August 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Geotech report needed

Work carried out by the owner/operator

4th August 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Alex Kirkham

Work carried out by an employee of the company

10th July 2019

Workmanship
 5
Cost
 2
Schedule
 5
Communication
 5

Soil Test

Work carried out by the owner/operator

20th June 2019

Workmanship
 4
Cost
 4
Schedule
 4
Communication
 4

Pre Purchase Geotech report of Cliff top property

Work carried out by the owner/operator

5th June 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Rudsdale property 117 SH 33 Tikitere, RD4 Rotorua

Work carried out by the owner/operator

30th May 2019

Workmanship
 5
Cost
 4
Schedule
 5
Communication
 5

Mark out building site for house extension

Work carried out by an employee of the company

12th April 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Boundary Peg Locations

Work carried out by the owner/operator

11th April 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Pool install

Work carried out by the owner/operator

28th March 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

subdivision

Work carried out by a subcontractor

14th March 2019

Workmanship
 5
Cost
 4
Schedule
 5
Communication
 5

Geotech Report

Work carried out by the owner/operator

26th February 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Boundary Measure

Work carried out by the owner/operator

19th December 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

House Location Survey - Weymouth

Work carried out by the owner/operator

17th December 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Renovation QS required

Work carried out by an employee of the company

19th November 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5
Get started now! Post your job for free and find the right tradie. Post your job for free, now!