Trusted Surveyors.
NZ wide.
Sorted.

Learn more about the trades we cover.

Recent jobs posted

Check out how homeowners like you are using Surveyors on Builderscrack to build, repair and improve their homes right now.

New build

Posted 1 hour ago

Looking to build a new unit and garage on 13 Rodney st Otahuhu. The existing building will stay.

Read more

Assessment wanted

Posted 2 hours ago

I need a qualified engineer to do an assessment and report to have my home relevelled

Read more

Structural Engineer needed for Timber Framed Resi Alterations

Posted 4 days ago

Existing timber framed house undergoing alterations. Require a Structural Engineer to prepare design, calcs and docs for building consent. Ideally working in Revit

Read more

Perform a geotechnical survey of the backyard for deck installation

Posted 5 days ago

We are planning to build a deck in our backyard and wish to utilize the ground screw pilings from ... .nz. They will require a geotechnical survey of the site. The deck will abut the rear wall of the home and is about 9 meters X 2 meters. We require a geotechnical survey of the site so stopdigging can provide us a feasibility assessment and structural plans.

Read more

House addition planning

Posted 6 days ago

Soil investigation, slope stability & foundation recommendations for a house extension/addition, prep work to submit for building consent to commence Sept/Oct 2019

Read more

Geotech report for 800 m2 site

Posted 6 days ago

Hi, I need a geotech report suitable for designing foundations for a block of 4 units. The site is approx 800 m2 and probably TC3. It currently has a small house on it.

Read more

Firewood Shed

Posted 1 week ago

B1: Footings & Foundations (Concrete and Concrete Masonry) Footing sizes do not demonstrate compliance with the nominated design solution. Please review and resubmit updated documentation. B1: Pile Pile Layout / Treatment / Type / Footing: Please demonstrate how compliance with these matters will be achieved. Pile Bracing: Demand is not satisfied. Please review and submit complying details. Pile Fixings: Please review and resubmit complying documentation that demonstrates how pile fixing asse...

Read more

Geotechnical report

Posted 1 week ago

For WCC, "Geotechnical report in accordance with NZS 3604, Site Requirements." For single storey 150 m3, new dwelling.

Read more

Retaining wall inspection

Posted 1 week ago

Inspection of retaining wall. As you look down on top of the wall, it is not straight and also leaks water. Home on weekends and after 4pm on weekdays.

Read more

Opinion on structural integrity of the property

Posted 1 week ago

Investigate structural integrity of the property, potentially due to a drop/settling in one corner. This is an urgent job as the house is currently under conditional offer.

Read more

Civil Engineer

Posted 1 week ago

3 Site Subdivision Civil Engineer Needed Flood Risk Assessment Stormwater design Wastewater designEarthworks plan EPA

Read more

Quantity Surveyor Required to Price Up Renovations

Posted 1 week ago

We have a full set of Consent ready plans for our renovation/Extensions which we would like to have priced up in detail. I have already received a number of Quotes for the Major big items required for the renovation/extension which i am happy to pass on.

Read more

Scalar penetrometer test - not for council - porirua

Posted 1 week ago

hi I would like a scalar penetrometer test done of the my back-yard - this is for peace of mind, and is not for any council required building consent application (which has already been issued). The ground is around 700sqm, almost flat, in Cannons Creek; the soil appears to be clay, with around 30cm of topsoil/loosefill on top of it. I would primarily like to know if there are any reasons for concern around the ground quality. I would like this done as soon as possible.

Read more

Structural check and possible repair

Posted 1 week ago

Hi, We have a number of cracks throughout the house and in two rooms the windows don't close well. I am at the end of painting the lounge that had one very large long crack and two smaller long ones, all from one window to the floor. One of which wasn't there before when I was plastering. I want to do a new kitchen and am afraid it might cause new cracks in my lounge. Also, there are five new three storey apartments getting built in front of our house. Only the main structure has been erected....

Read more

Structural engineers report

Posted 1 week ago

Need a structural engineers report for an existing building where there is a crack in the outer brick wall

Read more

Foundation Inspection

Posted 1 week ago

A concern that we aren’t trained to comment on is it looks like some of the ring foundation has been poured over tree stumps. Over time the stumps have decayed and left cavities that don’t look to be affecting anything structurally, but would need possibly an engineer to report on.

Read more

Pre-purchase GeoTech and Builder’s report - residential

Posted 2 weeks ago

Hi, we are looking for the above reasonably quickly (before EOD 7th June), and as we live some distance from the property concerned would appreciate a person(s) with top notch communication skills and patience with daft questions! Many thanks.

Read more

Surveyor, Nuhaka

Posted 2 weeks ago

Need boundary lines pegged out on a piece of land that I have purchased. 1088m2, on State Hwy 2 , Nuhaka 4198. Block 2C2W40. C/T HBD3/68.

Read more

Foundation problem

Posted 2 weeks ago

Need a geotechnical engineer to diagnose whether the uneven floor detected by Builder's report is from a small inexpensive problem or a huge very expensive problem before purchasing a property.

Read more

Recent surveying & engineering reviews

With over 136,000 reviews in total, and an average rating of 9/10, you can be confident that your job will be handled with the utmost care.

Pre Purchase Geotech report of Cliff top property

Work carried out by the owner/operator

5th June 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Rudsdale property 117 SH 33 Tikitere, RD4 Rotorua

Work carried out by the owner/operator

30th May 2019

Workmanship
 5
Cost
 4
Schedule
 5
Communication
 5

Mark out building site for house extension

Work carried out by an employee of the company

12th April 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Boundary Peg Locations

Work carried out by the owner/operator

11th April 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Pool install

Work carried out by the owner/operator

28th March 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

subdivision

Work carried out by a subcontractor

14th March 2019

Workmanship
 5
Cost
 4
Schedule
 5
Communication
 5

Geotech Report

Work carried out by the owner/operator

26th February 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Boundary Measure

Work carried out by the owner/operator

19th December 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

House Location Survey - Weymouth

Work carried out by the owner/operator

17th December 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Renovation QS required

Work carried out by an employee of the company

19th November 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Top Survey

Work carried out by the owner/operator

24th October 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Small engineering specs job

Work carried out by the owner/operator

6th October 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 4

Land survey


28th September 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Land Bridge Engineering - Weymouth

Work carried out by the owner/operator

19th September 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Engineer for extension of existing deck

Work carried out by the owner/operator

16th September 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Structural Engineering for a residential property

Work carried out by the owner/operator

14th September 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Surveyor to update flats plan

Work carried out by the owner/operator

20th August 2018

Workmanship
 5
Cost
 5
Schedule
 4
Communication
 5

Murrays Bay backyard and fence line

Work carried out by the owner/operator

17th August 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Engineering design for renovations

Work carried out by the owner/operator

12th June 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Establishing fence line


21st May 2018

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5
Get started now! Post your job for free and find the right tradie. Post your job for free, now!