New Zealand is at Alert Level 4. Please be aware only emergency works can be carried out on residential and commercial property during this time. Tradies and Homeowners can still communicate to discuss quotes and information for future jobs, as long as this is in-line with the current Alert Level 4 restrictions. More information available here.

Trusted Surveyors.
NZ wide.
Sorted.

Learn more about the trades we cover.

Recent jobs posted

Check out how homeowners like you are using Surveyors on Builderscrack to build, repair and improve their homes right now.

Kitchen Renovation

Posted 1 week ago

Require a calculation & design to reduce the length of a bracing wall in my kitchen. Current wall has 2 x 0.6m brace line gib sheets to one side, strapping to the floor and 2 x M12 bolts to the timber subfloor underneath. Looking to reduce the length of the wall from 3m long to 1m or less.

Read more

Subdivision

Posted 1 week ago

One lot is to have a piece of land subdivided and sold

Read more

Retaining wall

Posted 1 week ago

I am hoping to get advice around the construction of a retaining wall and whether I require a consent. I have purchased a sloping piece of land and will be putting a 2nd hand house onto it. I have to cut and fill the land and at its deepest am looking at a 3 metre-ish drop. I was going to terrace two retaining walls and put gardens or lawn in between with about a 2-3 metre gap between them. There is a slope above the top retaining wall. Looking at legislative commentary, on the building. ... si...

Read more

Two bedroom unit

Posted 1 week ago

I need a surveyor to give me a quote

Read more

School Renovation Works - Multiple sites around Tauranga

Posted 2 weeks ago

Hi, we are Architeck Ltd, an architectural service provider. We have a few school sites that involve renovation jobs; small to medium size scope of works. We require registered Quantity survey for each site. All going well, we would like to engage someone to do QS on all our school sites. We need quotes per site urgently.

Read more

Design of a new building compromising 2 workshops

Posted 2 weeks ago

Design of a new building compromising 2 workshops and associated offices as well as parking to be done as following: 1. Foundation investigation. 2. Sketches of panels, slab, foundations, bracing, metal purlins & 2 supporting beams. 3. Inspection (PS 1 & PS 4). Note: Structural & Architectural drafting will be done by our draftsman.

Read more

Geotechnical report

Posted 2 weeks ago

We have applied for building consent to build 2 new dwellings in addition to existing house at 14 Ivon road, Otara. We need the geotechnical report for our property at 14 Ivon Road, Otara

Read more

Remove Concrete Block Walls

Posted 2 weeks ago

I want to know if I can remove a concrete block wall and how much remedial work will be required.

Read more

Hollywood

Posted 2 weeks ago

Testing movement of land under footings.

Read more

Structural engineer for two storey home renovation

Posted 2 weeks ago

Looking to make bottom level open plan by removing wall and adding a beam. Also want to widen external doorways for aluminium Stacker doors.

Read more

Subdision of Section

Posted 3 weeks ago

We own a 1186sqm property in Onerahi, (title as in picture), and were wondering if it was viable / cost effective to subdivide ? Any help appreciated or point us in right direction please. Thanks

Read more

Peg out planned move

Posted 3 weeks ago

Need a surveyor to peg out a house location. House is being moved back.

Read more

Land surveyor

Posted 3 weeks ago

Looking for Land surveyor for subdivision of land

Read more

THE NON COMPLIANT FLATS PLAN WITH THE EXTENSIONS THERE #2

Posted 3 weeks ago

the garage had been extended by about 1 metre and was so when we bought it in 2006. I was able to purchase it with bank approval then but now banks require the flats plan to resemble the certificate of title description or we get the description changed to match the here and now. We quotes to have that extension approved by council and also to lodge new flats plan with land registrar OR to have the costs of removing the extra metre and thereby returning the flats plan to its original costed...

Read more

Boundary

Posted 3 weeks ago

We need confirmation of location of boundary pegs as we believe land has been taken by our neighbour.

Read more

Geotech Report for Resource Consent

Posted 3 weeks ago

I need a Geotech Report done for our Subdivision application for Resource Consent. Plans and Site Topo can be supplied on request. Cheers.

Read more

THE NON COMPLIANT FLATS PLAN WITH THE EXTENSIONS THERE

Posted 3 weeks ago

the garage had been extended by about 1 metre and was so when we bought it in 2006. I was able to purchase it with bank approval then but now banks require the flats plan to resemble the certificate of title description or we get the description changed to match the here and now. We seek quotes to have that extension approved by council and also to lodge new flats plan with land registrar OR to have the costs of removing the extra metre and thereby returning the flats plan to its original c...

Read more

Draw foundation piles for 40 foot container

Posted 3 weeks ago

We need an engineer to use our current geotech report to design driven posts to go under our 40 foot shipping container. Asap

Read more

Land surveyor for subdivision

Posted 3 weeks ago

Need land surveyed for subdivision. 1/4 acre.

Read more

Seep drainage

Posted 3 weeks ago

Install seep pipes to help drain excess water away from slip.

Read more

Recent surveying & engineering reviews

With over 159,000 reviews in total, and an average rating of 9/10, you can be confident that your job will be handled with the utmost care.

Property survey

Work carried out by the owner/operator

8th March 2020

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Residential Geotech

Work carried out by an employee of the company

4th March 2020

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Geotechnical report

Work carried out by the owner/operator

22nd February 2020

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Load calculation and sign off for council

Work carried out by the owner/operator

17th February 2020

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 4

Boundary pegs for fence (x 2)

Work carried out by the owner/operator

14th February 2020

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Topographical Survey

Work carried out by an employee of the company

9th February 2020

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Site Survey for moving house


4th February 2020

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Identify boundary line for fencing

Work carried out by the owner/operator

2nd February 2020

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Establish boundary pegs on property


29th January 2020

Workmanship
 5
Cost
 4
Schedule
 5
Communication
 5

Boundary surveying, replacement of missing survey pegs

Work carried out by an employee of the company

20th January 2020

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

survey

Work carried out by the owner/operator

17th January 2020

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Identify corner boundary

Work carried out by the owner/operator

17th January 2020

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Geotech report

Work carried out by an employee of the company

11th January 2020

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

set out the 4 proposed building corners as per building consent plans

Work carried out by the owner/operator

13th November 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Amending unit title survey for 3 units

Work carried out by the owner/operator

12th November 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Survey Land for Retaining Wall Design

Work carried out by an employee of the company

8th November 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Wykeham place

Work carried out by the owner/operator

31st October 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Cracked brickwork

Work carried out by the owner/operator

30th October 2019

Workmanship
 5
Cost
 4
Schedule
 5
Communication
 5

Surveyor

Work carried out by the owner/operator

11th October 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5

Geotech Report

Work carried out by the owner/operator

11th October 2019

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5
Get started now! Post your job for free and find the right tradie. Post your job for free, now!