Posted 8 years ago
House appears to be moving and need lifting and re-piling. Can you please help!!
Need labour only to install house slab reinforcing. Only 2 x D12 longitudinals in 60m of strip footing and 180m2 of mesh on slab. Site prep done. Ready to tie steel.
Rib raft foundation about 125 sm.
I need a report on the house foundations and what the best solution for relevelling is
Need to go below house block wall pour a footing or pavers for a nova drain trench 11m x 200mm
I need to put a concrete slab on top of an old concrete patio to level it out for a wooden deck to go on top of it. It's highest point would be 30mm deep and lowest around 60mm. The area is around 3400mm x 7700mm
Looking for a quote on adding mechanical pile to bearer fixings where the second story overhangs our back porch and to check stability & condition os exisiting piles.
I need a concrete pad laid for a garden shed. (possible two sheds) Shed One: 2.28 x 2.28 m Shed Two: 1.75 x 1.75 m
Price for 6m x 3m concrete floor to be laid, for a new kitset garage Flat site, grass, will be located at front of house easy access.
Require underpinning and retaining wall built with deck constructed on top. Geotechnical and engineers drawings have already been obtained with details on construction methodology to be used. Site is accessible but challenging due to slope.
Our company needs a concrete pit built into an existing factory floor so a lift can be placed into Approx. 1680mm x1130mm x 400mm deep plus concrete/block walls and slab.
There is a hole adjacent to the driveway drain. I suspect this is potentially causing the garage corner to subside. Remove drive concrete for access to drain and investigate.
I have discovered a section of piling in the basement has a significant amount of rot. The piles (approx 4) sit on top of bearer that is bolted to the concrete floor. The bearer as been exposed to pro longed moisture and needs to be replaced.
I need a small part of my house repiled at a reasonable cost, gathering quotes before commiting to a builder to do the job.
Batch in Huia needs leveling work done on the small room in the photo. Further repairs to gib & joinery also required, not necessarily from the same contractor.
Piles for 100sq meter house
We need 3 or 4 piles replacing or repairing asap
I am looking for a LBP to lay a small slab.Approx 5-5 square metres. This is to be the floor for a basement bathroom. The slab will support retaining walls up to 1-5m approx. I will prepare metal base etc. But need a contractor to install boxing, fix reinforcing in place and pour concrete.I have draft plans. I wish to submit these to council soon. As part of my submission I will need to state who is building the slab. I expect to want to do this work Feb/March next year. Or if a miracle takes p...
Put Foundations in place to build a house on top Drill holes for 23 piles. 17 piles 200 diameter. H5 posts set in 400 dia boxed concrete pile - 3.0 m deep. 1 pile 300 diameter. H5 post set in 450 dia boxed concrete pile - 5.0 m deep. 5 piles 250 diameter. H5 posts set in 400 dia boxed concrete pile - 4.0 m deep. This is a sloping section. Some foundations in one corner close to driveway will only stick a little above ground level (incl the 5m deep one). The furthest away piles (1*4m d...
House needs repiling, levelling, most of the floors need to be removed and replaced 65msq approx.
I need a quote ASAP on a house we want to prurchase. A report has shown that the house has some borer in the foundations. Also the piles are H4 not H5 which I think they should be? Do these all need replacing? Also part of the house has not been built on proper foundtions and we'd like to know how/what it will cost to fix the problem.
Hello, I would like a small area repaved please. I have the pavers but need to be relayed please. Area is about 5 m x 5m. thank you.
Foundations are in average condition. Some movement noted. Uneven flooring found in some rooms indicates settling of some foundation piles. May need to strengthen piles.
We need a foundation escavated so we can start concrete foundations also a retaining wall needs doing as well
Releveling a 1930's 100sqm timber floor
The house shakes when we walk through the hallway - seems to be to do with the wide spacing between the joists along that part of the house. What can be done to fix this? 140 sqm Cedar house on wooden pilings?
Hi, I need 3 timber piles replaced due to rot and a section of floor joist replaced for the same reason in a 1960's house. The timber piles are sitting on top of concrete plies coming out of the ground and are on the external wall. The base fibrolite may need removing/replacing. The floor joist is on the outside edge of the house and will need a weatherboard or 2 removed to access.
It looks like the original piling hasn't been replaced from our 1928 built house. House size is about 70 square meters on a relatively flat section. Wanting to know how much to re-pile and re-level
Foundation for a 213 square meter two storey addition to the existing house.
Partner with Builderscrack