Posted 14 years ago
New Bathroom
Require a 2.4x2m bathroom refit.
Will need to replace floor, wall & roof linings with aqua GIB, remove existing shower, bath & vanity and re plumb as the layout of the bathroom will change slightly (bath is turned 90 degrees). We will supply New Shower, Bath, Vanity.
Also require new lights, extractor fan & heated towel rail to be installed. We will also supply these new.
We will paint the walls & ceiling so only need to be stopped & ready to paint finished.
We also require 2 x toil...