Active job

Line the Boat Shed

Job description

Other (Building)
Rodney

Published on 24 May 2011

We've framed up & closed up the outside with ply & windows, now need the inside walls gibbed/stopped. Ceiling also needs to be framed up and gibbed/stopped. Small amount of framing up for a bathroom too. Could be an on-going project until completion of a small studio unit. Small caravan for use if you want to stay out here while working!


Trade professionals

#1
Tradie 1
unrated
1 job
No longer in contact
#2
Tradie 2
unrated
8 jobs
No longer in contact
#3
Tradie 3
190 jobs
No longer in contact
#4
Tradie 4
unrated
0 jobs
No longer in contact
#5
Tradie 5
unrated
10 jobs
No longer in contact
#6
Tradie 6
unrated
13 jobs
No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo