Posted 4 years ago
Repiling of existing Sleepout
House Piling
Wellington Central, Wellington
We have the Engineering Drawings , Survey and Original Building consent for re-piling one side of the sleepout , fixing the deck in-front and conversion into a studio.
I have the drawings and plan and will provide it to the interested builder after site visit
The whole job consists of three phases:
Phase 1- Re-pile the existing sleep-out and fix the deck
Phase 2- Add a toilet, bathroom and little kitchenette as per the drawings and connect the drainage and water supply from the existi...