I have a 2 story house. The living area upstairs hangs out over the lower floor. Its supported by 2 metal poles going into one pile. This pile has failed. The house needs to be jacked up and leveled . I believe 2-3 new piles would be better than the existing situation.
#1 | Tradie 1 |
|
215 jobs | No longer in contact |
#2 | Tradie 2 |
|
25 jobs | No longer in contact |
#3 | Tradie 3 |
|
13 jobs | No longer in contact |
Partner with Builderscrack
Get work