Posted 11 years ago
Ribraft floor slab - builders labour
We've just had our floor guy pull out of doing the boxing/tieing/etc for our ribraft floor...so we need a builder to do the following:
setout, box, tie steel, place pods & spacers, mesh, etc ready for the concrete layers to come in.
There will be some interaction with the plumber and electrician obviously as well.
Slab is 285m2
Sandpad is down and tested ok.
FFL will be 400mm above existing ground, so there is a 100mm of sand above ground currently, and slab is to go over this.
Materia...