Posted 2 years ago
Shed Concrete Pad
New Concrete Foundations
Te Kowhai, Waikato
6m x 4.8m shed to be placed on level section. Concrete pad needs to be 20mm shorter on both ends, 200mm deep on outside and minimum 100mm deep in centre. I assume there is a need for rebar, control joints and moisture barrier so please include this in the cost estimate. If it is easier for me to book a Concrete delivery please let me know, otherwise can that be included in the cost too.
Timetable is the next 4 weeks and I can clear and level the area pre job start to reduce donkey work.