Published on 19 March 2014
We've just had our floor guy pull out of doing the boxing/tieing/etc for our ribraft floor...so we need a builder to do the following: setout, box, tie steel, place pods & spacers, mesh, etc ready for the concrete layers to come in. There will be some interaction with the plumber and electrician obviously as well. Slab is 285m2 Sandpad is down and tested ok. FFL will be 400mm above existing ground, so there is a 100mm of sand above ground currently, and slab is to go over this. Materials covered by our account with M10. It would be preferable if you had existing boxing materials to re-use. We're needing someone available ASAP - wanting to start next week if possible. Plans attached. Please note shear key piles are NOT required. Full set of approved plans available at the time of the job.