Posted 4 years ago
Bathroom Renovation
Bathroom Design
Musselburgh, Dunedin
- Remove old shower , vanity, toilet, tiled splashback, old flooring
- New shower installed (frameless or semi frameless in Matt black trim, would consider tiled or arcylic) note depth of existing shower is 880mm, but looks like 900mm may fit, can go 1100mm length. Have already purchased new shower head and mixer.
- install new vanity and basin, new splash back, Matt black basin mixer
- install new toilet suite (note p trap connection from side, refer photo) if unable to replace pan a new c...