Posted 12 years ago
Fireplace Removal, bolier shift, shower room
These give an idea of what we want, will need to discuss detail
Job 1
Remove a chimney breast and fireplace, cap external roof. Move Hot water cylinder to laundry. Replace entire wall with either a new build wall, with doors that slide into wall, or repair wall. Plaster and pain ceiling, level floor. Length of area approx 3m
Job 2
Option for replacing hot water cylinder in laundry with gas boiler, build area for external gas supply, run pipe for gas to kitchen
Job 3
Remove existing shower...