Active job

Fireplace Removal, bolier shift, shower room

Job description

General Building
Selwyn

Published: 3 December 2012

These give an idea of what we want, will need to discuss detail Job 1 Remove a chimney breast and fireplace, cap external roof. Move Hot water cylinder to laundry. Replace entire wall with either a new build wall, with doors that slide into wall, or repair wall. Plaster and pain ceiling, level floor. Length of area approx 3m Job 2 Option for replacing hot water cylinder in laundry with gas boiler, build area for external gas supply, run pipe for gas to kitchen Job 3 Remove existing shower room, build new shower room 2.5m x 2.5m, install waste for shower (custom size, but in existing waste position), line wet areas, install shower fittings, install light, towel rail, heating, vinyl to floor, prepare non wet areas for paint. add ventalation


Trade professionals

#1 Tradie 1 No recent reviews 66 jobs No longer in contact
#2 Tradie 2 No recent reviews 24 jobs No longer in contact
#3 Tradie 3 No recent reviews 12 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo