Review

Full bathroom renovation

Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image

Job description

Bathroom Renovation
Wellington

Bathroom (W)1700mm x (L)2680mm x (H)2450mm Bath (L)1650mm x (W)720mm The cupboard and heater on the left-hand side should go, but everything else should be replaced. The lino should come up, vanity out, bath removed, shower enclosure removed, and all replaced. Ceiling ventilation needs to be installed above the shower to meet healthy homes standards (and electrical safety). Job includes: - removing lino and old things - painting walls, ceiling, trim (let's assume white with navy trim for now) including the cupboard on the left which can stay - replastering ceiling if needed - replacing all plumbing - code-compliant water-handling floor - could be tiled or lino The bath can't get much smaller, and it would be nice if it was deep. The property is a rental so as well as visual appeal, practicality and durability and disaster-proofing are essential.


Review

Workmanship
4.0
Cost
5.0
Schedule
5.0
Communications
4.0

The tradesman quoted a sharp price and completed the job as quoted.

Work carried out by the owner/operator
Reviewed on 08-11-2020

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo