Published: 15 May 2024
Remove small corner Basin, bathroom cabinet and tiles 2 high above the Basin. Taps have been disconnected and removed.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very friendly and capable. Great communication and responsed very quickly.
Work carried out by the owner/operator
Reviewed on 28-05-2024
#1 | Tradie 1 |
|
15 jobs | Secured job |
#2 | Tradie 2 |
|
3 jobs | No longer in contact |
#3 | Tradie 3 |
|
114 jobs | No longer in contact |
Partner with Builderscrack
Get work