Published: 22 February 2014
Remove existing dated fittings - bath with shower over, toilet, vanity and surround top. Replace with modern in same locations. Tiling or painting as necessary to modernise from existing wood effect. Remove fake wooden floor replace with tile.
#1 | Tradie 1 |
|
75 jobs | No longer in contact |
#2 | Tradie 2 |
|
44 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 15 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 17 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 3 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 9 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 4 jobs | No longer in contact |
Partner with Builderscrack
Get work