Published: 15 May 2024
I need the 2 copper pipes cut off and sealed behind the vanity. Once water is turned off job will be to remove vanity and the cut vertical pipes as per photo at or near floor level and seal off.
#1 | Tradie 1 |
|
2 jobs | No longer in contact |
#2 | Tradie 2 |
|
71 jobs | No longer in contact |
#3 | Tradie 3 |
|
97 jobs | No longer in contact |
#4 | Tradie 4 |
|
99 jobs | No longer in contact |
Partner with Builderscrack
Get work