Stormwater Drainage

Job description

Drainlaying
Rodney

Published: 26 April 2018

Stormwater Drainage - Two Parts: 1. Bricks along driveway to be lifted and socked Novacoil to be installed and connected to new stormwater drain, which in turn needs to be run along boundary and back to an existing chute out over the cliff. Total length approx. 100m. 2. Construct a water riser in an existing sump in basement under the house and feed into new drain and finally into existing chute. Total length approx. 35m Work needs to be completed before end of May.


Review

Workmanship
4.0
Cost
4.0
Schedule
5.0
Communications
5.0

We only proceeded with one part of the job as a result of a change on my part. Warren was great to deal with and communicated in a timely fashion. He showed-up when arranged, which is a bonus in today's world. The work was performed according to plan and the only reason we didn't mark it to 5 was that there are always ways to do things better and we've got a bit of tidy-up to do and rubbish to get rid of. Altogether, I think Warren does a great job and I wouldn't hesitate recommending him.

Work carried out by the owner & subcontractors
Reviewed on 01-06-2018

Verified Builderscrack review