Review

cut, fit and glue

Job description

Drainlaying
Rodney

Published: 12 July 2017

Trench already dug for a 2 metre tap into existing rainwater drain. Also need 9 metres of drain channel (already on site) installed and tapped into rainwater drain placed directly in the channel line. Council approved building works, so no hobbyists. Thanks


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Work carried out by the owner/operator
Reviewed on 22-10-2017

Tradesperson reply
"Awesome to work for,thanks vince"

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo