Published: 13 July 2010
We have just posted our application to Vector to have Gas connected to the house. It's already in our street and close to our house so is at no cost to us. It will be approximately 5-6 weeks before we will need the work done. We would like a Gas Fitter to connect the gas to our existing plumbing. We will only be using Gas to heat water. (Not for any other appliances). Once that is all done, we will need the old cylinder drained and removed from the kitchen and also to drain the extra solar cylinder in the ceiling cavity. Remove solar panels from the roof and close any holes. (After this is all done, we will be getting the roof cleaned, tiles repaired and roof repainted) Cheers.
#1 | Tradie 1 | No recent reviews | 13 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 2 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work