Published: 11 June 2020
• Decommission existing water main line (old black line) • Replace new watermain pipe by way of manual excavation and pipe being laid from water meter to home inlet up to 8 metres in grass (see photo) • Back fill as required to NZBC standards • Final connection to water meter and home inlet • Testing • Commissioning Must be registered master plumber. Looking for estimate and/or quote.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Job was done quickly and to a high quality standard. Of 3 plumbers that I asked for a quote, he came back to me within 24 hours as he was confident to quote from the photo. The other two were supposed to do site visits but never did and after one week I gave up on trying to get them to provide a quote. I did have one other quote from another plumber but this quote came in much higher than the quote from PJ Wall. I would use again.
Work carried out by the owner/operator
Reviewed on 06-08-2020
Tradesperson reply
"Thank you Micheal for your time in reviewing PJ Wall Plumbing Limited.
Kind Regards."