Active job

storm drainage

Job description

Drainlaying
Hamilton

Published: 15 March 2017

Need drainage installed (thunder flo or similar) in front of double garage and front entrance to house. under ground drains already installed. Approx 14 mtrs required.. Required due to resealing of drive and drainage levels not kept.


Trade professionals

#1 Tradie 1
36 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo