Published: 8 November 2018
We are having our bathroom floor tiled. The tiler has asked for the (fairly new) toilet to be disconnected and removed on Thursday 15 November 2018, so that he can put underlay and tiles on the floor underneath. The toilet would need to be reconnected about 5 or 6 days later. While the plumber is here, we also have new bath taps to be installed. Thank you.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Chris was very professional and reliable. He kept to arranged times for the work, and went the extra mile to help out with an unanticipated complication with the job.
Work carried out by the owner/operator
Reviewed on 28-11-2018
Partner with Builderscrack
Get work