Published: 7 February 2014
An existing beam and lintel in our downstairs area both need minor relocation as well as further strengthening and bracing, as follows: - Relocate existing beam, onto new posts and straps and foundations - Replace existing lintel with new beam. Relocate this new beam in line with the relocated existing beam in the previous item. Place new beam on new posts. - all work to be done to NZS3604 standard, as per design drawings and engineer's inspection report which will be provided.
#1 | Tradie 1 | No recent reviews | 2 jobs | No longer in contact |
#2 | Tradie 2 |
|
49 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 7 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 3 jobs | No longer in contact |
Partner with Builderscrack
Get work