Active job

Rectify drainage

Job description

House Piling
Wellington

Published: 31 May 2013

The work is twofold: 1. Remove the existing slab at the rear of the dwelling and to excavate and compact base course then to re-pour a new slab to fall away from the dwelling to a drainage gutter to allow water to escape away from the dwelling as this is not the case at present. 2. Remove approx. 4 squ metres of Concrete outside of the laundry and to excavate 300mm deep ,then to compact base course to allow a new slab to be 175mm below floor level with a fall away from the dwelling as the outside existing slab is too close to the existing floor level.


Trade professionals

#1 Tradie 1 No recent reviews 70 jobs No longer in contact
#2 Tradie 2 No recent reviews 1 job No longer in contact
#3 Tradie 3
81 jobs No longer in contact
#4 Tradie 4 No recent reviews 5 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo