Published: 22 April 2013
We are looking to add bracing to a basement and replace some piles based on an engineer's report. The job entails propping the upper floor, excavating and removing existing totara piles and plastered brick infill, constructing 5 new replacement piles and connecting to existing floor structure and finally installing 5 new wall bracing plywood panels including all connections.
Partner with Builderscrack
Get work