Posted 9 years ago
Foundation pile driving
House Piling
Rotorua, Rotorua
We need to drive approximately 60 200mm SED poles (3600mm long) into soft soil. They will need to be driven approx 2400mm into the ground (some more some less). Our section is flat, triangular in shape, and access is somewhat limited for excessively big vehicles and plant. The closest line of piles to the boundary is 2.5m away from the fence. I'm thinking that a 12t digger or similar is probably as big as we could fit in - and still have room to get it out once the job is done. This job would be...