Published: 12 July 2021
approx 8 metres in length with the highest point being 1.5 metres, mostly dug out and drainage already in, open to ideas on types of concrete work but do not want timber - will require references or similar examples
#1 | Tradie 1 | No recent reviews | 85 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 24 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 2 jobs | No longer in contact |
Partner with Builderscrack
Get work