Published: 23 February 2015
Need a small piece of concrete to be cut out of the floor in our 'cave' to allow us to drain water into it, a sump hole which would allow the water to be sucked out with our water pump.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
Great to deal with. Communicated well. Did a good job. Many thanks
Work carried out by the owner/operator
Reviewed on 27-02-2015
#1 | Tradie 1 | No recent reviews | 5 jobs | Secured job |
#2 | Tradie 2 | Not reviewed | 0 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 5 jobs | No longer in contact |
Partner with Builderscrack
Get work