Published: 14 January 2015
We would like 2 single garages to have the concrete pads layed. We will supply boxing, steel, and concrete. We just need the work done by someone with experiance in doing this. The garages are side by side with firewall and can be done at once. We will have the dig out done. This work will be required in about 2-3 weeks.
Partner with Builderscrack
Get work