Active job

Concrete pad for shed

Job description

General Concreting
Christchurch

Published: 27 July 2014

Dropping a new timber shed into the backyard in a few weeks and was going to construct the pad myself but the cost and time needed is getting up to the 'may as well get someone else to do it' level. The area that needs to be laid currently has some old pavers and a tin shed on it which I am removing soon. The new pad will be a strip about --- along a fence. The access down the back between my house and garage isn't the best so if a truck was used I think some wheelbarrows would be in order but it is all flat and level.


Trade professionals

#1 Tradie 1
90 jobs No longer in contact
#2 Tradie 2 No recent reviews 1 job No longer in contact
#3 Tradie 3
15 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo