Concrete House Slab Pour

Job description

General Concreting
Christchurch

Published: 22 December 2013

130m2 labour only concrete place required, slab on ground. Concrete is supplied via Firth. My builder will have boxed up the slab. Because of a couple of dead men residing within the slab footprint (from which an adjacent wall is propped), the pour will be two stages - first stage will be majority of the slab (everything minus where the two dead mean are sitting) and second stage will be simply filling in that small patch once the dead men are moved clear. (Dead men are 1 x 1 x 1m blocks of concrete - some don't seem to know this term.) First place planned for 21 Jan 2014, and second place would be approx 1-2 weeks after that. Good site access.