Published: 12 April 2020
Good morning all! Happy Easter. We are considering having some concreting done... We have a garage which the floor level is lower than the driveway level and hence when it rains, the water comes in.... It's around 3-4 inches lower! So, we are considering getting a new garage.... Can we concrete on top of the existing concrete? If not what would the cost to remove and then redo it? The areas is approx 10 metres x 5 metres. With thanks Mario
#1 | Tradie 1 | No recent reviews | 72 jobs | No longer in contact |
#2 | Tradie 2 |
|
30 jobs | No longer in contact |
#3 | Tradie 3 |
|
211 jobs | No longer in contact |
#4 | Tradie 4 |
|
77 jobs | No longer in contact |
#5 | Tradie 5 |
|
87 jobs | No longer in contact |
#6 | Tradie 6 |
|
262 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 5 jobs | No longer in contact |
#8 | Tradie 8 |
|
72 jobs | No longer in contact |
Partner with Builderscrack
Get work