We have built a kit set garage on the front of our section and require the area (approx 20- 25meters) in front of it to be concreted. Ground prep work and concreting required.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
3.0
|
Communications |
3.0
|
Quality of the job was good however the tradesman did appear to be doing this job in his spare time which caused it to drag out a bit. Also it was agreed that the tradesman would remove all the broken concrete from the original driveway however more than a month has passed with no sign of him.