Review

upgrading path.

Job image
Job image

Job description

Footpaths
Christchurch

Person required to remove existing white marble chip from a base of gravel, remove chip from site, check compaction of base then overlay the area with 100mm thick of concrete. Finish to be as per existing which is probably done by wood float. No boxing is required as the area is edged with 100 x 50 tanalised pine. The concrete is required to be at the same level as the top of the timber with concrete to be scrubbed from the pine to give a clean edge on completion. The area involved is 22 m2.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

This was Jamies first job through Builderscrack and I went with him because he made contact very quickly and made a site visit that afternoon (Sunday). We reviewed the area and work required and then verbally agreed on a price. This was followed up by a written quotation and I accepted this through Builderscrack. The work was completed to a high standard on the Wednesday of the same week it was quoted. All together a good experience rather than a hassle as some jobs are. Thanks Jamie

Work carried out by the owner/operator
Reviewed on 07-07-2016

Tradesperson reply
"Thankyou for you're review, I enjoyed whole process to completion and I'm glad you are satisfied with the outcome of you're job, I'll be happy to help again if needed Cheers, Jamie"

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo