Posted 14 years ago
Concrete slab
Concrete Driveways & Paths
Porirua
2 slabs, 1 to be done asap a, 6m x 4m for dog run, no fill needed poured direct onto existing base needs to be boxed and poured.
2nd slab the week after ( when the dog run is on its new pad), area 10metres by 5.5metres, will need to be boxed, compacted 100mm reinforced, polystyrene and poured.