Project

Full House renovation

Start of the Project
Start of the Project
New Mains Cable.
New Mains Cable.
Barthroom
Barthroom
New Meter box
New Meter box
Old Meter box
Old Meter box
Old Switchboard
Old Switchboard
New Switchboard
New Switchboard
Pre-wire
Pre-wire
Living room with new Downlights
Living room with new Downlights
Rangehood installation
Rangehood installation
New Kitchen
New Kitchen
Ducted heat pump  controller
Ducted heat pump controller
Mitsubishi ducted heat pump
Mitsubishi ducted heat pump
Barthroom 2
Barthroom 2
Small Bedroom
Small Bedroom
Pre-Wire
Pre-Wire

Project description

This property was in pretty bad condition and the power had been disconnected as it had been unoccupied for over six months.
An inspection was required to determine if it was safe to reconnect the power to the property. After that the builders had power to plug in their tools and the work could begin.

The house was completely stripped out and had a new switchboard, meter box and
ducted heat pump installed. All new wiring and new modern recess downlighting was fitted throughout.

It was great to see new life brought into this building, The tenants are very happy with this warm dry house that now meets the latest electrical standards.

Last updated on 01-05-2024