Entire floor was flooded and deemed defected requiring entirety of flooring to be relayed. From demolition stripped back to the subfloor framing, we got our substrate and hardwood flooring re-laid and came out looking better then how it originally looked.
Last updated on 19-03-2024
Partner with Builderscrack
Get work