Project

New channel drain

Before
Before
Before
Before
Setting up channel location
Setting up channel location
Concrete cut and broken out
Concrete cut and broken out
Setting channels in place and checking levels
Setting channels in place and checking levels
All connected to existing system
All connected to existing system
Finished concrete
Finished concrete
Complete, brush finish
Complete, brush finish

Project description

This client was having issues with water pooling near the back door, due to badly formed concrete pathways. We agreed the best option was a new channel drain through the low spot, connecting to an existing cesspit. The client was really happy with the result and using the existing infrastructure we were able to keep the costs down.

Last updated on 25-10-2026