Project

Verandah Spouting Replacement

Project description

Replaced approximately 6 metres of deteriorated verandah spouting with new Gothic-profile spouting in Grey Friars, complementing the existing roof and maintaining the character of the verandah.

The work involved removing the old guttering, fitting the replacement run and connecting it to the existing drainage.

Localised rust treatment was also completed around the bullnose roof junction and adjoining valley. Loose corrosion was mechanically removed, the affected metal prepared, and three protective treatment coats applied. Localised sealant repairs were completed at deteriorated sections, with the coatings and sealant allowed to cure for more than 24 hours.

Before-and-after photographs documented the work. Further maintenance recommendations were provided for separate roof flashing joins and weathered roof coatings.

Last updated on 15-10-2026