Project

Front Entrance Drainage

Before - very wet and muddy
Before - very wet and muddy
Trench is dug-out, already catching a lot of water!
Trench is dug-out, already catching a lot of water!
Coil installed on a bed of scoria and wrapped in filter sock
Coil installed on a bed of scoria and wrapped in filter sock
New cesspit connected
New cesspit connected
Trenches filled with scoria and site cleaned up.
Trenches filled with scoria and site cleaned up.
Finished product, river stones to make a decorative finish and concrete re-instated around the cesspit.
Finished product, river stones to make a decorative finish and concrete re-instated around the cesspit.

Project description

This client had water pooling near the front door, making the concrete green and slippery and the nearby gardens a muddy mess. We dug-out all the mud, installed new coil drains and a cesspit to catch the water run-off, and connected everything to the existing stormwater.
We completed the job by filling in the drainage trench with scoria, then covering with river stones for a nice tidy finish. The area is now dry and creates a nice landscaped feature at the front entrance.

Last updated on 16-09-2026