Published: 23 June 2024
I am in the process of renovating an internal garage and need to level the concrete floor. The current floor has some sort of waterproof treatment. The area to be levelled is approx 3600 x 3650. The amount of fall is approx 40mm The side that needs levelling will also include a door nib in the same pour – this will be exposed to external weather.
#1 | Tradie 1 |
|
61 jobs | No longer in contact |
#2 | Tradie 2 |
|
70 jobs | No longer in contact |
#3 | Tradie 3 |
|
49 jobs | No longer in contact |
#4 | Tradie 4 |
|
27 jobs | No longer in contact |
#5 | Tradie 5 |
|
4 jobs | No longer in contact |
#6 | Tradie 6 |
|
8 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 0 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 6 jobs | No longer in contact |
Partner with Builderscrack
Get work