Published: 8 November 2022
I have plans drawn up for a replacement deck requiring building consent. The draughtsman has the plans in the preliminary stage now needing an engineer to view site and advise back before the final plan is drawn.
#1 | Tradie 1 |
|
6 jobs | Secured job |
#2 | Tradie 2 |
|
4 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 3 jobs | No longer in contact |
Partner with Builderscrack
Get work