Published: 13 May 2024
Existing portacom , fully installed on the property, but requires council Certificate of Compliance application. Needing an engineer to help with the following: The information required is listed below: • A full site plan showing the location of the building and distances to boundaries and any other buildings. • Plans for the superstructure and foundations. • Elevations • Construction details • Any relevant producer statements (PS1, PS3, PS4) from designers and contractors involved including certifying plumber and drainlayer. • Memorandum from licensed building practitioner (record of building work) • Any relevant photographs • Geotech report • Confirmation of the use of the building • Electrical Certificate
#1 | Tradie 1 |
|
2 jobs | Requesting contact |
#2 | Tradie 2 |
|
3 jobs | No longer in contact |
#3 | Tradie 3 |
|
1 job | No longer in contact |
#4 | Tradie 4 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work