Published: 17 February 2022
We hope to build a deck over our backyard but due to 300mm and 375mm wastewater pipes running under our backyard, anticipate that the structural engineer will need a geotech report. Timing: asap but flexible
#1 | Tradie 1 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work