Active job

Posts removal & strengthening of beam

Job image
Job image

Job description

Structural Engineer
Auckland

Published: 17 September 2021

Looking to remove a couple of posts and strengthen the beam to give an increased span. On the one side, the 240 x 45 timbers support a 1.2m wide deck and on the other side a light roof. The spans between the existing posts are shown. Note that there is a corner post between the two that will remain and will support on end of each beam.


Trade professionals

#1 Tradie 1
20 jobs No longer in contact
#2 Tradie 2
4 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo