Active job

Stormwater connection invert needed

Job description

Land Surveyor
Auckland

Published: 22 May 2018

I have a new stormwater connection that the last surveyor failed to plot an IL for signoff. There is a manhole on the far side of the adjacent property that an IL could be identified. I have the gradient of the pipe from a CCTV image. The council is happy with a calculated invert. I need a plan, cad file and certification statement for council sign off.


Trade professionals

#1 Tradie 1 No recent reviews 16 jobs No longer in contact
#2 Tradie 2
52 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo