Published: 11 May 2018
I want to remove a few piles from my basement and install a steel beam in order to create an open plan area which I can then concrete. The max span I am looking at is ~7.5 meters. But if absolutely required I could have one pile remaining so that I would have 2 spans one on ~5m and one ~ 3m. I want a structural engineer to look at the situation and advise, and if we proceed, to do that calculations for a building consent applictaion etc.
#1 | Tradie 1 | No recent reviews | 11 jobs | Secured job |
#2 | Tradie 2 |
|
70 jobs | No longer in contact |
Partner with Builderscrack
Get work